01 / Transformation

See the difference.

An actual before-and-after pair published on the company's Full Rehab page. Drag the center handle to compare the original kitchen cabinets and sink with the updated finish.

Kitchen cabinet and sink area before renovationKitchen cabinet and sink area after renovationBEFOREAFTER
↔
Verified before + after

Kitchen Refresh

A refreshed cabinet finish, updated countertop appearance, and a modernized sink area help transform the feel of the space. The two source images are explicitly named “Before” and “After” on the original website.

View original project photos ↗
02 / Selected Work

Craftsmanship in every frame.

Selected photographs from the existing Alexander Builders website, reorganized into a clean, browsable portfolio. These are site photographs, not AI-generated construction images.

Source galleries: Carpentry · Porches · Basement Finished · Full Rehab.
03 / Construction Process

Show the work behind the result.

A documented deck-construction series and an interior-finishing series. Photos are labeled by what is visibly shown; exact project dates and full completion sequences should be confirmed before publication.

Deck construction — from groundwork to framing

Pre-build rear yard
01 · PREPARATION

Site and material setup.

Footings laid out for deck
02 · FOOTING LAYOUT

Footing positions and structural layout visible.

Timber framing of an elevated deck
03 · STRUCTURAL FRAMING

Elevated deck posts, beam and joist framing.

Basement renovation — finish-stage documentation

New basement wallboard
01 · WALLBOARD

Interior gypsum wallboard installation.

Drywall taped and mudded
02 · JOINT FINISHING

Taped and finished drywall joints.

Basement paint preparation
03 · FINISH PREPARATION

Wall finish and paint preparation in progress.

Construction stages are based on visible site images. Deck series and basement series are separate; they are not presented as one job or as a verified photographic timeline.